This is how the Berger house is built.
This is how a large prefabricated house is built. Real information about the construction and operation of a non-brick house in Hungary today. Berger House from the first meeting to the handover of the keys and beyond. Memories for us, information for you.
Source: youtube.com
How is a finished house built?
What is practical and feasible about this technology?
Practical and useful when a house needs to be completed quickly. In other words, the time factor is favourable. How many days can it take to complete? How to achieve 0 energy demand? Quality guaranteed! But how?
Production can be done in three days. Computer-controlled production ensures accurate sizing. So we really get what we design. How is it made? Before the final construction of the walls, the wiring is done on site This also boosts the time factor, as well as practicality, as no debris or waste is created by the wiring on site. This, in turn, means that the customer has to think about the installation of sockets and luminaires during the production phase, with conscious planning. After the traditional base concrete is poured, the elements are embedded. How and by what methods this is done is worth a look!
Declaration: the short content published on our site is based on the original article cited as the source. The data and information published in this article are as stated in the source article, and we accept no legal or moral responsibility for its content.
Our site is the AirTheCash community information portal and only publishes articles that are of interest to the community and useful for its positive development.